Scheduling of a single machine to minimize total weighted completion time subject to release dates

Author:

Bianco Lucio,Ricciardelli Salvatore

Publisher

Wiley

Subject

General Engineering

Reference15 articles.

1. Sequencing with due-dates and early start times to minimize maximum tardiness

2. , and , “An Algorithm for Optimal Sequencing of Aircraft in the Near Terminal Area,” Proceedings of the 8th IFIP Conference on Optimization Techniques (Springer Verlag, Berlin, 1977).

3. and , “Il Problema del Sequenziamento Ottimo Degli Aerei in Area Terminale,” Rapporto dell'Ist. di Automatica dell'Universitá di Roma e del C.S.S.C.C.A.-C.N.R. R. 78–10 (1978).

4. , , and , “The Aircraft Optimal Sequencing as an N Job One Machine Scheduling Problem,” EURO III - Amsterdam (1979) and Rapporto dell'Ist. di Automatica dell'Univ. di Roma e del C.S.S.C.C.A.-C.N.R., R. 79–36 (1979).

5. On sequencing with earliest starts and due dates with application to computing bounds for the (n/m/G/Fmax) problem

Cited by 70 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3