Affiliation:
1. MOE Key Laboratory for Urban Transportation Complex Systems Theory and Technology, Beijing Jiaotong University, Beijing 100044, China
Abstract
An operational process at train marshaling yard is considered in this study. The inbound trains are decoupled and disassembled into individual railcars, which are then moved to a series of classification tracks, forming outbound trains after being assembled and coupled. We focus on the allocation plan of the classification tracks. Given are the disassembling and assembling sequence, the railcars connection plan, and a number of classification tracks. Output is the assignment of the railcars to the classification tracks. An integer programming model is proposed, aimed at reducing the number of coupling operations, as well as the number of dirty tracks which is related to the rehumping operation, and the order of the railcars on the outbound train must satisfy the block sequence. Tabu algorithm is designed to solve the problem, and the model is also tested by CPLEX in comparison. A numerical experiment based on a real-world case is analyzed, and the result can be reached within a reasonable amount of time. We also discussed a number of factors that may affect the track assignment and gave suggestions for the real-world case.
Funder
National Natural Science Foundation of China
Subject
Strategy and Management,Computer Science Applications,Mechanical Engineering,Economics and Econometrics,Automotive Engineering
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献