Affiliation:
1. School of Petroleum and Natural Gas Engineering, Liaoning Shihua University, Fushun, China
Abstract
The horizontal well completion with stinger is usually used to control the bottom water cone. Although the pressure profile and the inflow profile along the horizontal wellbore can be divided into two parts by the stinger, these profiles have not really flattened. In order to flatten the pressure distribution and inflow distribution further, it proposes a new technology. This new horizontal well has multiple artificial bottom holes (MABH) along the wellbore and it has application potential. In order to verify the effectiveness of MABH technology, a model of horizontal well completion with MABH was established, and the production performance of different water cone control technologies was analyzed: conventional horizontal well, stinger completion horizontal well, and MABH completion horizontal well. The results show that the MABH technology has more advantages than the stinger technology. The uniformity of pressure distribution of the 6-MABH horizontal well is 55% higher than that of the horizontal well with string technology, and the uniformity of inflow distribution is increased by 65.25%. At the same time, although the operation of MABH technology is very simple, it should follow a rule of MABH installation: the position of the first MABH should be set at 242.5 m from the heel hole of the horizontal wellbore, and the other interval is 92.4 m.
Funder
China National Offshore Oil Corporation
Subject
General Engineering,General Mathematics
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献