Aiming at the low accuracy of index weight calculation and risk type identification in traditional cost risk management systems, this paper proposes a project cost risk management system based on an improved fuzzy rule weight algorithm. We analyzed the types of project cost risks, adopted a three-tier technical architecture to design the system frame structure and functional organization structure of the cost risk management system, and adopted the B/S architecture for network structure deployment. In the software part, an improved fuzzy rule weight algorithm is used to calculate the weight of project cost risk indicators, thereby improving the effectiveness of risk management. Experimental results show that the designed system works well, can accurately calculate the weights of risk indicators, and can effectively identify multiple risk types.
Funder
2018 College Scientific Research Project of Guangzhou Education Bureau
Subject
Computer Networks and Communications,Information Systems
Reference20 articles.
1. Use of Bayesian Network Characteristics to Link Project Management Maturity and Risk of Project Overcost
2. Research on the application of risk control in rail transit project cost management;R. W. Wei;Management & Technology of SME,2019
3. Bayesian Networks-based Shield TBM Risk Management System: Methodology Development and Application
4. Research on cost risk management of water conservancy project based on modified cloud model;L. T. Zhou;Water Resources and Power,2019
5. Research on comprehensive cost management of highway engineering life cycle based on BIM;X. Li;Highway Engineer,2019