Influencing Factors of Snow Melting and Deicing on Carbon Fiber Embedded in Bridge Decks

Author:

Tan Yan12ORCID,Zheng Shuang12ORCID,Xiao Henglin12ORCID,Xing JiaMing3ORCID

Affiliation:

1. College of Civil Engineering, Architecture and Environment, Hubei University of Technology, Wuhan 430068, China

2. Pilot Test Base for Melting Snow and Ice, Hubei University of Technology, Wuhan 430068, China

3. Hubei Communications Investment Northwest Expressway Operation Management Co., Ltd., Hubei, China

Abstract

To study the general law of the influence of embedded carbon fiber heating wires on the melting of snow and ice on bridge decks and to solve the problem of icing on large bridges in winter, relevant model tests were carried out. In this experiment, a carbon fiber heating wire was used as the heat source to make a large-scale asphalt concrete bridge deck model with a built-in carbon fiber heating wire. The effect of different heating powers, ambient temperatures, snow and ice thicknesses, and wind levels on the melting of snow and ice on bridge decks was studied. The snow-melting and ice-melting tests performed at different heating powers show that as the heating power increases within a certain range, the time required for the snow and ice layers to melt and the power consumption decrease. Under certain conditions, to ensure the rapid melting of snow and ice layers on the surface of road bridges, a heating power of 400 W/m2 is selected. At this time, the heating effect is the best, and this method is economical and practical. The snow-melting and ice-melting tests performed at different ambient temperatures and with different thicknesses of the snow and ice layers show that as the ambient temperature decreases or the thickness of the ice layer increases within a certain range while keeping the other factors constant, the time required for the snow to melt and the power consumption increase, and the power consumption is relatively large. The snow-melting test performed at different wind levels shows that with the increase in the wind level within a certain range while keeping the other factors constant, the uniformity of the overall temperature distribution on the surface of the specimen worsens, the snow-melting time increases, and the temperature rises. The rate of temperature increase decreases. Therefore, in actual engineering applications, when the wind speed is too high, the methods of manually or mechanically removing snow can increase the snow removal rate on bridge decks. Under different conditions, choosing the right heating power can effectively improve the efficiency of melting snow and ice on bridge decks. The research results of this paper provide a theoretical reference for the actual construction of bridge decks in the future.

Funder

Hubei Province Technical Innovation

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

Reference26 articles.

1. The status quo and development trend of snow removal equipment;W. Zhu;Agricultural Equipment and Technology,2011

2. Analysis of key points of expressway rapid snow removal and skid prevention construction;R. Wang;Inner Mongolia Highway and Transportation,2013

3. Model Experimental Study of Carbon Fiber Heating Wire for Deicing and Snow Melting on a Bridge Deck

4. The application status and development trend of organic salt snow melting agent;C. Cui;Chemical Industry Management,2020

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3