Abstract
Kori Unit 1 was permanently shut down on June 18, 2017. Since then, Korea is actively preparing for the decommissioning of the nuclear power plant. Because decommissioning work is performed in a radioactive environment, worker radiation exposure is a significant consideration. In this study, worker radiation exposure is evaluated during the steam generator, one of the heavy components of nuclear power plant, dismantling process. A radiation evaluation for the dismantling process is performed using the code RESRAD-BUILD. A steam generator dismantling scenario and optimal cutting method are designed to evaluate worker radiation exposure, considering pipe dimensions, cutting tool speed, and experience in steam generator replacement. The evaluation results are derived for each work type and year. As a result of the evaluation, worker radiation exposure is 7.5 man-mSv at the year of planned decommissioning.
Funder
Korea Institute of Energy Technology Evaluation and Planning
Reference16 articles.
1. Power reactor information system;International Atomic Energy Agency (Iaea)
2. Open nuclear power plant operation information;Korea Hydro and Nuclear Power (Khnp)
3. Estimation of Effective Dose to Residents Due to Hypothetical Accidents During Dismantling of Steam Generator
4. A Global Review of PWR Nuclear Power Plants