Simulation-Based Tracking Test and Optimization of Large-Tonnage Box Girder Transport with Trolley on an Erected Bridge

Author:

Wang Lei12ORCID,Lv Zhong-da2ORCID,Xu Ai-min3,Wang Fei2ORCID,Dong Xin-long1

Affiliation:

1. MOE Key Laboratory of Impact and Safety Engineering, Ningbo University, Ningbo 315211, China

2. Zhejiang Engineering Technology Research Center of Civil Engineering Industrialized Construction, Ningbo University of Technology, Ningbo 315211, China

3. Ningbo Highway Construction Management Center, Ningbo 315100, China

Abstract

In the construction of large-tonnage box girder, the construction load of box girder transport is generally greater than the operating load in highway industry; therefore, it is a crucial task to carry out accurate simulation and optimization on bearing box girder. For this purpose, the refined modeling method of 40 m/1270t box girder is studied first in this paper, followed by detailed stress analysis by considering the impact coefficient of vehicles and the most unfavorable conditions. Tracking tests on dead load, prestressed load, and the transport load have shown that the calculated stress values obtained by the refined models are very close to the measured stress values. Based on dynamic strain test of the vehicles at the speed of 4 km/h, the impact coefficient of four vehicles is estimated to be 1.08 and its value meets the requirements of no more than 1.1 provided by the vehicle manufacturer. Aimed at no tensile stress in the midspan section, the optimized geometry of 40 m box girder is obtained with less concrete and longitudinal prestressed tendons. These results demonstrate the plausibility and validity of the proposed research methods and optimization schemes for large-tonnage box girder transport.

Funder

National Natural Science Foundation of China

Publisher

Hindawi Limited

Subject

Civil and Structural Engineering

Reference27 articles.

1. Technologies and developments in precast segmental bridge construction;M. Rettinger;Beton-und Stahlbetonbau,2021

2. Topology optimization of horizontally curved box girder diaphragms

3. Recent developments of high-speed railway bridges in China

4. Design technique and exploration of high-speed railway bridges in China;Y. Z. Zhou;Bridge Construction,2018

5. A comparative study between structural properties of pre-tensioned inverted T-girder and actual post-tensioned box girder in bridge construction

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3