Thermodynamic and Economic Evaluation of Gas Turbine Power Plants

Author:

Oyegoke T.1,Akanji I. I.2,Ajayi O. O.3,Obajulu E. A.2,Abemi A. O.2

Affiliation:

1. Laboratoire de Chimie, ENS, l’Universite de Lyon, 69007 Lyon, France

2. Chemical Engineering Department, Ahmadu Bello University Zaria, Nigeria

3. Chemical Engineering Department, Federal University of Technology Minna, Nigeria

Abstract

Thermodynamic analysis and economic feasibility of a gas turbine power plant using a theoretical approach are studied here. The operating conditions of Afam Gas Power Plant, Nigeria are utilized. A modern gas turbine power plant is composed of three key components which are the compressor, combustion chamber, and turbine. The plants were analyzed in different control volumes, and plant performance was estimated by component-wise modeling. Mass and energy conservation laws were applied to each component, and a complete energy balance conducted for each component. The lost energy was calculated for each control volume, and cumulative performance indices such as thermal efficiency and power output were also calculated. The profitability of the proposed project was analyzed using the Return on Investment (ROI), Net Present Worth (NPW), Payback Period (PBP), and Internal Rate of Return (IRR). First law analysis reveals that 0.9 % of the energy supplied to the compressor was lost while 99.1 % was adequately utilized. 7.0 % energy was generated within the Combustion Chamber as a result of the combustion reaction, while 33.2 % of the energy input to the Gas Turbine was lost, and 66.8 % was adequately converted to shaft work which drives both compressor and electric generator. Second law analysis shows that the combustion chamber unit recorded lost work of 248.27 MW (56.1 % of the summation), and 77.33 MW (17.5 % of the summation) for Gas Turbine, while air compressor recorded 11.8 MW (2.7 %). Profitability analysis shows that the investment criteria are sensitive to change in the price of natural gas. Selling electricity at the current price set by the Nigerian Electricity Regulation Commission (NERC) at zero subsidies and an exchange rate of 365 NGN/kWh is not profitable, as the analysis of the investment gave an infinite payback period. The investment becomes profitable only at a 45 % subsidy regime. Keywords: energy conversion system, gas turbine, economic analysis, second law analysis, power plant.

Publisher

Sumy State University

Subject

General Materials Science

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3