Construction Project in Kuwait International Airport Cargo City: Issue of Conflict Management

Author:

Alazemi Mohammed,Mohiuddin AKM

Abstract

Conflict in construction projects seems to be the reasons of high project cost, project delays, lower productivity, loss of profit, damage business relationships and dispute on the team. Effective functioning requires commitment of at least several key personnel to get the venture runs effectively even with the presence of distinctive intrigue. When individuals of fluctuating foundation meet-up on a task group, strife is unquestionably present there. As the individuals inside the venture alliance are interrelated, intrigue impacts and clashes are not uncommon within their activities. This study therefore sought to discover the causes of these conflicts in the construction sector and the manner by which these conflicts can be effectively resolved. Here a quantitative survey-type study has been carried out on construction project in Kuwait international airport for conflict management. One hundred eighty eight questionnaires have been distributed, fourteen of them have been lost and eleven of them have not been answered. The responses of 163 participants have been analyzed with the Statistical Package for Social Scientists (SPSS). This study showed that the general causes of conflict are predominantly create conflicts. Inadequate communication and contradicting instructions according to the results are the leading causes of conflict. The effects of conflict on project mainly include project delays, ineffective construction and reduced productivity, etc. The findings revealed that participants in the study prefer the role of collaborating and compromising styles in solving conflict of on-site construction. Every project starts and ends with communication, so communication is the life wire of all construction projects. To cure the communication problem, the study suggests strategies like Team Meeting Discussions, Site Review Meetings, and Project Status Reporting platform to manage the conflict and reduce the dispute of construction projects.

Publisher

Deer Hill Publications

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3