1. Use of Passive Integrated Transponder (PIT) Tags to Monitor Migration Timing of Snake River Chinook Salmon Smolts
2. Migration of adult spring and summer Chinook salmon past Columbia and Snake River dams, through reservoirs and distribution into tributaries, 1996;Bjornn T. C.;Report for U.S. Army Corps of Engineers, Walla Walla, Washington, and Bonneville Power Administration, Portland, Oregon,2000
3. Migration of adult spring and summer Chinook salmon past Columbia and Snake river dams, through reservoirs and distribution into tributaries, part III;Bjornn T. C.;Report to U.S. Army Corps of Engineers, Walla Walla, Washington, and Bonneville Power Administration, Portland, Oregon,1998
4. Fallback, Reascension, and Adjusted Fishway Escapement Estimates for Adult Chinook Salmon and Steelhead at Columbia and Snake River Dams
5. Dam passage and fallback by Chinook salmon and steelhead as determined by passive integrated transponder tags and radio tags;Burke B. J.;Report of the National Marine Fisheries Service to the U.S. Army Corps of Engineers, Portland and Walla Walla Districts,2004