1. Hart, Cdr. W.T., Jr. , and I. E. Jackson , “Speed and Fuel Consumption Study Period 1 August 1944 to 31 July 1945,” Bureau of Ships, 1 September 1945.
2. Navsea , Speed-Time Profile Guide for Surface Ships, Fy 2002.
3. Office of Naval Research, “Surface Combatant Life Cycle Costs Operating & Support Costs,” PowerPoint brief, August 2000.
4. Opnav Instructin S9010, “Approved Top Level Requirement (TLR) for Arleigh Burke Class Guided Missile Destroyer (DDG 51),” 20 January 1993.
5. Opnav Instruction 4100.11B, “Navy Energy Usage Reporting System (NEURS),” 27 September 1989.