1. (1) J. Ishii: “Progress in Development of Power Compensator for DC Railway System”, GS YUASA Technical Report, 2006.12 Vol. 3, No. 2 (2006) (in Japanese)
2. 石井 順:「直流電気鉄道における電力補完装置の,開発経緯」, GS YUASA Technical Report, Vol. 3, No. 2 (2006)
3. (2) T. Ito, T. Kato, R. Miyakawa, H. Takahashi, R. Misakiya, K. Saeki, and M. Ido: “Development of Regenerative Energy Absorbing Equipment for Railway System Using Li Battery”, Technical Meeting on Transportation and Electric Railway, IEE Japan, TER-05-53, pp. 65-68 (2005) (in Japanese)
4. 伊藤智道.加藤哲也.宮川良平.高橋弘隆.三崎屋良介.佐伯恵介.井藤光夫:「リチウム電池式回生電力吸収装置の開発」, 電学交通電気鉄道研究会, TER-05-53, pp. 65-68 (2005)
5. (3) S. Hase, T. Konishi, A. Okui, Y. Nakamichi, H. Nara, and T. Uemura: “Application of Electric Double-layer Capacitors for Energy Storage on Electric Railway”, T. IEE Japan, Vol. 123-D, No. 5, pp. 517-523 (2003-5) (in Japanese)