Affiliation:
1. Key Laboratory of Geotechnical and Underground Engineering, Ministry of Education, Department of Geotechnical Engineering, Tongji University, 1239 Siping Road, Shanghai 200092, P.R. China.
2. Shanghai Tunnel Engineering & Rail Transit Design and Research Institute, 200 West Tianmu Road, Shanghai 200070, P.R. China.
Abstract
Via a long-term comprehensive instrumentation program, the performance of a 26 m deep metro station excavation constructed by the top-down method in downtown Shanghai was extensively examined. The measured excavation responses included diaphragm wall deflections, wall settlements, ground settlements, uplifts of interior steel columns, axial forces of propping struts, groundwater table levels, and settlements of adjacent buildings and utility pipelines. Based on the analyses of field data, the following major findings were obtained: (i) the concrete struts along with the floor slabs effectively suppressed later wall movements and consequently reduced the chance that the maximum wall deflections would occur above the excavation surfaces, (ii) with the progress of excavation to a lower depth, the diaphragm walls underwent a serrated settlement pattern over time, (iii) no significant post-excavation wall deflection occurred, (iv) the relationship between the interior column uplifts and the maximum wall deflections can be described by a linear equation, and (v) most system loads due to soil removal were carried by the concrete struts along with the floor slabs. The struts sustained mainly the released earth pressures due to the exposure of the adjacent portions of diaphragm walls, and the soil removal distant from the struts imposed limited effects on the strut axial forces.
Publisher
Canadian Science Publishing
Subject
Civil and Structural Engineering,Geotechnical Engineering and Engineering Geology
Cited by
172 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献