1. “Standard Review Plan for the Review of Safety Analysis Reports for Nuclear Power Plants,” NUREG-0800, Rev. 2, U.S. Nuclear Regulatory Commission (1981).
2. U.S.Code of Federal Regulations, Chap. 10, Part 100.
3. “Bases for Plugging Degraded PWR Steam Generator Tubes,” NUREG 1.121, U.S. Nuclear Regulatory Commission (Aug. 1976).
4. “Voltage-Based Interim Plugging Criteria for Steam Generator Tubes—Task Group Report,” NUREG-1477, U.S. Nuclear Regulatory Commission (June 1993).
5. “Voltage-Based Repair Criteria for Westinghouse Steam Generator Tubes Affected by Outside Diameter Stress Corrosion Cracking,” NUREG Letter 95-05, U.S. Nuclear Regulatory Commission (Aug. 3, 1995).