TTSS Retrieval via Coil Tubing Deployment Method in Sarawak Waters

Author:

Yap Y. H.1,Chua H. L.1,Mokhtar M. K.1,Choi Y. X.1,Haslan M. H.1,Isik F. S.2,Dasan L. M.1,Nicholas F. K. H.1

Affiliation:

1. PETRONAS Carigali Sdn Bhd, Miri, Sarawak, Malaysia

2. Setegap Venture Petroleum, Miri, Sarawak, Malaysia

Abstract

Abstract This paper delves into the operational hurdles encountered during coil tubing operations within a specific field in Sarawak, Malaysia. Focused primarily on the sand clean-out process and the challenge of retrieving a lengthy Through-Tubing Sand Screen (TTSS), this paper presents practical solution through the utilization of the coil tubing deployment method. This paper comprehensively outlines the operational techniques used by the project team during the coil tubing sand clean-out operation and the TTSS retrieval via coil tubing deployment. The project design process, involving evaluation of methods and equipment suitable for this operation, is also discussed in this paper. The success of this project proves that a combination of efficient choices, with the utilization of coiled tubing for cleanout, and collaborative work between coiled tubing and other service providers for the TTSS retrieval, can be implemented for retrieval of lengthy downhole accessories. Sand production has become one of the most difficult challenges for mature oil fields, adversely affecting well deliverability and potentially contributing to well shut-in and surface equipment failure. Offshore facilities are not typically designed to handle sand long-term, resulting in well closures when sand production becomes excessive. Various efforts can be implemented to enhance the sand handling capacity or minimize sand exposure to surface, among them is by installing a Through-Tubing sand screen (TTSS). TTSS is easy to install, and its low-cost wireline operation makes it one of the preferred choices to address sand issues. This method, however, requires periodic maintenance and replacement to remain efficient. Excessive sand production caused by failures in both primary and remedial sand control measures eventually leads to the accumulation of sand within the production tubing. A longer TTSS can be installed to increase the longevity and durability of the TTSS. However, installation of long accessories also presents a retrieval challenge. One solution as presented in this paper is to utilize the coil tubing to provide efficient cleaning of debris above the TTSS and sufficient jarring force to release TTSS from tubing. The retrieval of TTSS on surface, however, is limited by the stackup length afforded on surface to allow proper securing of well prior to retrieval. This challenge is overcome by implementing coiled tubing deployment method to secure TTSS on surface into coiled tubing stackup, isolate well from surface safely, and handing over to wireline for the full retrieval of tool above wellhead. The overall workflow of this project allows for the successful retrieval of the TTSS to surface and can be considered in mind when designing the installation and/or retrieval of other lengthy toolstring/downhole completions.

Publisher

SPE

Reference5 articles.

1. Harris, Anthony, Zbitowsky, Ron, Dughaither, Abdullah, Webber, Lionel, and NeerajSethi. "Case Study of a Complex, Heavy-Duty, High-Pressure Fishing Job Using Wireline, Slick Line and Coiled Tubing Intervention." Paper presented at the SPE/ICoTA Coiled Tubing and Well Intervention Conference and Exhibition, The Woodlands, Texas, USA, March 2018. doi: https://doi.org/10.2118/189928-MS

2. Mabry, Sam, Walker, Rohan, and CarlBenge. "Coiled Tubing Deployment of 3.5 " Tubing To Be Used As Offshore Gas Pipeline." Paper presented at the SPE Western Regional Meeting, Bakersfield, California, March 1995. doi: https://doi.org/10.2118/29635-MS

3. Tang, Catherine, YeLin, Yeap, Wei Jian, Zulkifli, M Zin, Bt MJeffry, SuzannaJuyanty, Minggu, Nur'ain, Chin, Alvin, ZhiSiang, Kong, Randy, ZhengChen, MYusof, Aqil, Liew, Paul Lyan, Azman, MuhamadSyazwan, Praveen, Kumar, Yusnawannie, Ilyas, FahmiAmni, MustafaalBakeri, and Zaimi BZainul. "Holistic Performance Review of Through-Tubing Sand Screen as Remedial Sand Control: Best Practices and Lesson Learnt from Past Installations in Offshore East Malaysia Oil Fields." Paper presented at the ADIPEC, Abu Dhabi, UAE, October 2022. doi: https://doi.org/10.2118/211317-MS

4. Thomeer, H. V., and D. M.Eslinger. "Safe Deployment of Specialized Coiled-Tubing Tools in Live Wells." Paper presented at the SPE Annual Technical Conference and Exhibition, Washington, D.C., October 1992. doi: https://doi.org/10.2118/24621-MS

5. J. Li , T.Green, "Coiled Tubing Sand Clean Outs Utilizing BHA Technology and Simulation Software in Demanding Wellbore Geometries" Paper presented at the SPE/DGS Saudi Arabia Section Technical Symposium and Exhibition, Al-Khobar, Saudi Arabia, May 2011. doi: https://doi.org/10.2118/149051-MS

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3