15K Multistage Fracturing Completion System Addresses Operational Challenges, Improves Production Performance and Cost Savings in Openhole Environments

Author:

Rodoplu Rasim Serdar1,Sobowale Adegbenga O.1,Hanson Jon E.1,Wright Beau R.2

Affiliation:

1. Aramco

2. Baker Hughes

Abstract

Abstract Multistage fracturing (MSF) ball drop completion systems have been utilized around the globe for effectively treating formations completed as open hole and cemented. Multiple, high-rate hydraulic fracturing stages are pumped through these completions while gaining efficiency during pumping operations. A challenge within the industry was developing systems that are capable of higher pressures (greater than 10k psi) while still being able to be deployed in challenging openhole environments with minimum equipment and intervention requirements. This paper will discuss the planning, deployment and fracturing execution operations of an improved version of one of these systems. To be able to effectively utilize any MSF completion system; formation properties, deployment environment, lateral length, openhole size, liner size, and tubing movements during fracturing should be thoroughly analyzed and equally considered. To create a reliable system, another important consideration is how the system will be deployed; a long string to surface, or will it be deployed as part of a liner hanger system? In the case of the latter, it should be compatible with the liner hanger system by accommodating multiple balls to set and release the hanger system and actuate the openhole packers. In tight formation environments, where treating pressure differentials reaches as high as 15,000 psi during fracturing operations, openhole packers that are capable of holding these pressures in challenging openhole conditions are needed. Not only the packers but also the remaining completion system components need to be capable of withstanding, including burst, collapse, and ball-to-ball seat differential while simultaneously accommodating the pressure with cooling and ballooning induced tubing movement caused by these high pressure treatments. Improving such a robust design with innovative solutions, such as dissolvable frac balls that can handle 15,000 psi differential, optimizes the overall process. The completion design, deployment, and subsequent fracturing operations on a well showcases how effective consideration of components operates as a system can create a reliable MSF system. It also demonstrates how close collaboration between reservoir management, production engineering, completion experts, and vendor results in a coordination of efforts that eliminates operational hazards, thus ensuring smooth operations. The successful deployment of an openhole MSF completion system that can handle 15,000 psi with dissolving frac balls and eliminating openhole anchors helped pave the way to deal with tighter formations in an efficient and cost-effective manner. With the help of this new technology, the well planners were able to address operational challenges that would have otherwise required additional equipment or would have limited deployment capabilities. The engineering approach and design to develop this completion system and utilization in the right candidate confirmed the benefit of the novel completion for field development options.

Publisher

SPE

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3