Experiences With an Efficient Rate-Management Approach for the 8th Tortonian Reservoir in the Vienna Basin

Author:

Kornberger Martin1,Thiele Marco R.2

Affiliation:

1. OMV E&P

2. Streamsim Technologies/Stanford University

Abstract

Summary Active well-rate management to promote the efficient use of injected fluids and to demote fluid cycling is a simple way to increase recovery in brown fields while minimizing costs and preserving existing field/well-fluid-handling constraints. In this work, we present the application of an efficient flow-based surveillance technique to drive rate-management decisions for the 8th Tortonian reservoir in the Vienna basin, Austria. The 8th Tortonian is a typical example of a decade-long peripheral waterflood on a long, steady decline for which it is difficult to justify expensive drilling/workover programs. Active rate management to improve pattern sweep presents an inexpensive solution to increase recovery. In case of the 8th Tortonian, EUR 10 000 (USD 13,000) was spent to modify well rates, resulting in approximately 5700-m3 (approximately 35,000-STB) incremental oil recovered during a 30-month period. The current oil rate remains higher than the oil rate before the start of the project. Our approach takes advantage of streamline-derived well-allocation factors (WAFs) to quantify injector/producer connections. It is simple and efficient to estimate WAFs with total historical well-fluid rates, well locations, and a geological model. With the WAFs, the ratio of produced oil to injected water (efficiency) of each injector/producer pair can be estimated. Well-pair efficiencies are the starting point for the rate-management approach described in this work. A simple, single-homogeneous-layer system was used in conjunction with historical rates and well locations to estimate the WAFs for the 8th Tortonian reservoir. Connections were compared with available tracer data, and an area of interest was subsequently selected in which both streamlines and tracer data confirmed oil recovery by injected water. A key constraint was to maintain the total gross rate of the area selected at current capacity. New target rates were determined and implemented, resulting in a 30% increase of oil rate during a 30-month period. Considering the simplicity and efficiency of the approach, this is a notable result. The production response of the selected wells showed an increased recovery in conjunction with a relatively constant water cut, suggesting contact with previously unswept oil. All operations and modifications were performed at minimal cost. There were no perforation changes or acidizing jobs involved, and rate changes were obtained simply by changing pump sizes or increasing the number of strokes by changing the V-belt pulley.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Geology,Energy Engineering and Power Technology,Fuel Technology

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3