Recent Developments in the Design of Grouted Connections

Author:

Tebbett I.E.1

Affiliation:

1. Wimpey Offshore Engineers and Constructors Ltd.

Abstract

Summary A recently completed major research project on the structural behavior of grouted pile/sleeve connections covered static strength, the effect of cyclic movement during grout setting, long-term fatigue, calibration of measured strengths for different quality-control samples, and the investigation of connections removed after 13 years of service in the North Sea. Preliminary data from this project resulted in the issue of revised guidance notes by the U.K. Dept. of Energy and have been recognized in recent amendments to API RP 2A. This paper discusses unpublished test results, the provisions of the latest design codes in relation to the available data, and the implications for design. Results and discussions apply to all types of grouted connections and many types of structures, including pile/sleeve connections for fixed jackets and tension leg platforms and grouted connections used for repair of tubular structures. platforms and grouted connections used for repair of tubular structures. Introduction Grouted pile/sleeve connections are a critical element of offshore structures, especially for deeper-water fixed platforms and seabed templates where piles terminate below platforms and seabed templates where piles terminate below sea level and welding of the pile to the sleeve is not practical. Grouted connections are also used extensively practical. Grouted connections are also used extensively for repair and strengthening applications for both jacket members and joints. The piles may be distributed around the base of the structure (the so-called skirt-pile arrangement) or may be grouped (the cluster-pile arrangement) at the base of the main legs. In either case, the grouted connection between the pile and sleeve forms the primary load transfer between the structure and its foundation piles. These connections vary in length and size according to the structure and location. Recent designs are adopting shorter connections (generally 6 to 12 times the pile diameter in length) as test data on their strength and performance become available. The geometry of a typical connection based on a cluster design for a major North Sea platform is shown in Fig. 1. This paper outlines the results of a major research project undertaken with U.K. Dept. of Energy funding and project undertaken with U.K. Dept. of Energy funding and comments on the latest provisions of design codes that recognized this research effort. A complete discussion of the research program is given in Ref. 1.

Publisher

Society of Petroleum Engineers (SPE)

Subject

General Engineering

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3