Flow Assurance Challenges for China’s First Deepwater Gas Field Development in South China Sea

Author:

Lau Lawrence Khin1,An Kun1,Tang Xian Di1,Luo Fei Jian1,Yang Yang1,Zhao Wei Qing1

Affiliation:

1. China National Offshore Oil Corporation

Abstract

Abstract This paper elucidates the key flow assurance challenges for China’s first National Deepwater gas field development in South China Sea and the facilities design forming the overall flow assurance management strategy. The discussion covers early stage feasibility studies through current stage of project execution. In addition, the finding of flow assurance analysis serves as key input for start-up and commissioning guidelines as well as operating procedures. The development consists of a semi-submersible, with the Eastern and the Western loops spanning more than 40 km of Subsea Production System (SPS). Due to long subsea tiebacks, integrated flow assurance analysis is rolled out to ensure comprehensive risks analysis and active risks management. In particular, key challenges associated with typical Deepwater characteristics such as high pressure and low temperature are actively managed. With design water depth of more than 1500 m and more than 10 Deepwater subsea production wells, robust flow assurance management strategy is required from early activities such as well unloading, well test, pre-commissioning, first gas, through late life decommissioning. Integrated approach is implemented for overall system thermohydraulics analysis, which is used as basis for key flow assurance assessments, including but not limited to management strategy for hydrate, scales, erosion, and slugging. Detailed management strategy and philosophy are discussed in the main body of this paper. Overall chemical management strategy, for instance, is fully optimized to reduce Health, Safety, Security and Environment (HSSE) impact, coupled with sufficient safety margin to ensure minimum downtime. Through integrated flow assurance analysis, all key risks are identified and actively managed. This shows the importance of integrated flow assurance approach to ensure overall project safety and integrity. More importantly, overall optimization can be successful rolled out when the field is in production. This serves as a positive lesson learned for future Deepwater development in South China Sea.

Publisher

SPE

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3