Underbalanced Coiled Tubing Drilling: Delivering Well Production Safely in High H2S and Tight Gas Reservoirs, UAE

Author:

Khan Rao Shafin Ali1ORCID,Molero Nestor2ORCID,Alam Shah Sameer2ORCID,Mishael Mohammad Basim2ORCID,Basha Maged2,Zia Arslan2ORCID,Zhylkaidarova Sholpan2ORCID,Abd El-Meguid Mohamed Osama3,Al Ali Abdulrahman Hasan3,Saleh Abdalla3,Almazrouei Saeed Mohamed3,El Shahat Ayman3,Bin Sumaida Ali Sulaiman3,Al Mutawa Ahmed Abdulla3,Yousfi Fawad Zain3,Almteiri Nama Ali3,Baslaib Mohamed Ahmed3,Mantilla Alfonso4ORCID,Ladmia Abdelhak4ORCID

Affiliation:

1. SLB (Corresponding author)

2. SLB

3. ADNOC Onshore

4. ADNOC Upstream

Abstract

Summary United Arab Emirates (UAE) is seeking to become self-sufficient in gas supply by 2030. This has led the country to initiate several exploratory and appraisal projects to achieve this goal. This study covers one such pilot project targeting production from tight gas reservoirs in three wells through a coiled-tubing (CT) underbalanced drilling (UBD) project in ADNOC Onshore. CT pressure control equipment (PCE) was rigged up on top of production trees with wells already completed and cemented. A CT tower was used to accommodate the drilling bottomhole assembly (BHA) and eliminate risks related to its deployment. CT strings were designed to reach target intervals with sufficient weight on bit (WOB), suitable for sour environments, and able to withstand high pumping rates with mild circulating pressures. To address the hazards of H2S handling at the surface, a custom-fit closed-loop system was deployed. The recovered water was treated on the surface and reused for drilling to decrease the water consumption throughout the operations. The plan was to drill 3 3/4-in. horizontal laterals in all candidate wells. Each well was completed with a combination of a 4 1/2-in. and a 5 1/2-in. tubing and a 7-in. liner. Five laterals were drilled across the three candidate wells targeting carbonate reservoirs with each lateral having an average length of ~4,000 ft. The achieved rates of penetration varied significantly from 15 ft/min to 30 ft/min while drilling through the various formations. Over the course of the pilot project, several challenges had to be addressed, such as material accretion on the CT string during wiper trips, treatment of return fluids having high H2S content and rock cuttings, and ensuring the integrity of the CT pipe while operating in severe downhole environments. Solutions and lessons learned from each well were implemented subsequently in the campaign, such as the use of increased concentrations of H2S inhibitor to coat the CT string, the use of nitrified fluids based on changing well parameters to maintain underbalance, thorough pipe management through real-time CT inspection, and adding a fixed quantity of fresh water to the drilling system every day to avoid chemical reactions between the drilling fluid additives and hydrocarbons. The wells completed with this method exceeded production expectations by 35–50% across the project while reconfirming the value of the technology. The use of CT for UBD is still considered a challenging intervention worldwide. Such cases in high H2S environments are rare. This study outlines best practices for a CT UBD and a setup that can be replicated in other locations to implement this methodology with high H2S and when rig sourcing is a concern.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Geotechnical Engineering and Engineering Geology,Energy Engineering and Power Technology

Reference4 articles.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3