Wellbore Design With Reduced Clearance Between Casing Strings

Author:

Barker J.W.

Abstract

Wellbore Design With Reduced Clearance Between Casing Strings J.W. Barker SPE/IADC Member Abstract In the past the industry relied on general rules-of-thumb to determine the clearance between casing strings. In today's difficult cost environment all traditional design factors should be challenged and an engineered solution determined. When a detailed engineering analysis is performed, these general rules-of-thumb are often found to be conservative or out-of-date. With recent technological improvements the limiting factor in the wellbore and casing design process is often the acceptable clearance between casing strings. As a result, detailed engineering analysis is needed to determine the clearance required between casing strings for the particular application. With the optimum clearance between casing strings designed for each situation, well casing sizes can often be reduced or additional casing strings can be accommodated in the well design. This concept is important today as the industry is drilling more wells with the combined challenges of high pressure, high mud weight, high temperature, and deep depths. Such wells often require more casing strings to reach total depth yet designers are limited by existing rig equipment sizes and capabilities. Introduction Many years ago the industry developed general rules-of-thumb for clearance requirements between casing strings and drilled holes. These rules-of-thumb resulted in commonly used casing and bit size combinations. Generally, at least 0.6- to 0.8-in. of radial clearance between a casing string coupling and the design inside diameter of the next larger casing string were recommended. A hole diameter 3-in. larger than the casing outside diameter (OD) was recommended for ideal cementing. These general rules-of-thumb did not differentiate between applications depending on depth, mud properties, etc. Pressure surges from running casing strings were not critical design issues since there was usually a large margin between formation fracture pressure and formation pore pressure. In today's economic environment. well designers cannot afford to leave excessive margins between formation fracture pressure and formation pore pressure even on routine wells. More difficult wells are also being drilled that are deeper and have higher formation pressures. Drilling problems are increasingly encountered which require surge pressures be maintained in very narrow limits while running and cementing as many as six casing strings in a well. Each additional casing string adds significant cost and complicates the casing size selection process. Typically the well design process begins with the selection of the desired size production tubing and moves uphole. With the very high cost of deep, high pressure wells, larger size tubing strings capable of conducting economical flow rates are desired. Production casing sizes greater than 9 5/8-in. OD are often required to accommodate tubing sizes as large as 7-in. OD or large dual subsea completions. The large production tubing size constrains the design at the bottom of the well and available blowout preventers (BOP's) will constrain the surface casing size. High pressure BOP's larger than 18 3/4- to 20-in. inside diameter (ID) are not routinely available today. Following traditional rules-of-thumb for selecting casing clearances will likely severely limit the number of casing strings that can be set while drilling the well. Many operators are now challenging the traditional rules-of-thumb for the needed clearance between a casing string OD and the drilled hole during running and cementing operations. Synthetic muds, inhibited muds, and improved cements available today will likely make this rule-of-thumb obsolete very soon. In the past, drilling a hole larger than the last casing string ID was often difficult and costly. Recent advances in concurrent drilling and hole opening technology have made drilling larger than casing ID holes economical and almost trouble free even in larger hole sizes. P. 341^

Publisher

SPE

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Enhanced Geothermal Systems – Promises and Challenges;International Journal of Renewable Energy Development;2021-12-01

2. Casing Seat Selection and Sizing;Elements of Oil and Gas Well Tubular Design;2018

3. Bibliography;Elements of Oil and Gas Well Tubular Design;2018

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3