Affiliation:
1. Shell Exploration & Production Co.
Abstract
Abstract
The industry makes a pioneering discovery: 20,000 psi SITP, 100 ppm H2S, 10 % CO2, 400°F flowing wellhead temperature. Now what? Everyone wants production as soon as possible. What challenges need to be overcome? What equipment is available, and what needs to be designed and tested? How long will it take to design, build, test (and redesign, re-test), certify, and deliver? What challenges have yet to be identified? If you have a failure, can you work it over? Is there well control equipment in place?
Recent HPHT history indicates that infantile failures happen, usually caused by something that no one considered an issue. What are the hidden obstacles awaiting the first ultra HPHT completion? This paper will summarize current industry HPHT capability and more importantly, propose questions in an attempt to stimulate discussion on issues that we may be missing.
HPHT Completion Challenges
Industry is currently drilling wells to severe HPHT conditions, e.g., SITP 20 ksi, BHT 470°F, 25,000 ft depths. One day someone may have the chance to complete one of these monsters! Of course, everyone will want production ASAP.
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献