Case Study of Underbalance Coiled Tubing Drilling to Increase Well Productivity and Ultimate Recovery in Tight Gas Reservoir Onshore Field, Abu Dhabi

Author:

Ladmia Abdelhak1,Culen Martin2,Al Katheeri Abdulla Bakheet1,Al Hosani Fahad Mustfa Ahmed1,Edmonstone Graham F. J.1,Mantilla Alfonso1,Baslaib Mohamed Ahmed3,Nabil Ihab Mohamed3,Yousfi Fawad Zain3,Al Hosani Mariam Ahmed3,Almenhali Salem Saleh3,El Shahat Ayman1,Abdulsallam Fouad3,Al-Khatib Haitham Mohamed3,Al Jaberi Fawzi Omar3,Al Beshr Huda3,Mcneilly Kevin Dean3

Affiliation:

1. ADNOC Upstream

2. Blade Energy Partners

3. ADNOC Onshore

Abstract

Abstract Coiled Tubing Drilling (CTD) has been growing and developed rapidly through the last two decades. There have been numerous highly successful applications of CTD technology in Alaska, Canada, Oman and the United Arab Emirates (Sharjah Sajaa and Dubai Murgham fields), among other places. Currently, Saudi Arabia has undertaken a campaign for the last seven years that has shown successful results in gas reservoirs. ADNOC initiated a trial Coiled Tubing Underbalanced Drilling (CTUBD) project in the onshore tight gas reservoirs in Abu Dhabi, United Arab Emirates beginning operations 1-December-2019. The initial trial will consist of three (3) wells. The purpose of the trial is to assess the suitability of CTUBD for drilling the reservoir sections of wells in these fields, and further application in others. The reason for choosing coiled tubing for drilling the reservoir sections is based upon the high H2S content of the reservoir fluids and the premise that HSE can be enhanced by using a closed drilling system rather than an open conventional system. The three wells will be newly drilled, cased and cemented down to top reservoir by a conventional rig. The rig will run the completion and Christmas tree before moving off and allowing the coiled tubing rig to move onto the well. The coiled tubing BOPs will be rigged up on top of the Christmas tree and a drilling BHA will be deployed through the completion to drill the reservoir lateral. The wells will be drilled underbalanced to aid reservoir performance and to allow hole cleaning with returns being taken up the coiled tubing / tubing annulus. The returns will be routed to a closed separation system with produced gas and condensate being primarily exported to the field plant via the production line, solids sparge to a closed tank or pit and the drilling fluid re-circulated. The primary drilling fluid will be treated water; however, nitrogen may be required for drilling future wells in the field and will be required regardless for purging gas from the surface equipment during operations. A flare will also be required for emergency use and for start-up of drilling. If the trial proves a success, a continuous drilling plan will be put in place.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3