Abstract
Abstract
Annular gas migration through micro-annuli in cement, or casing vent flow, is a common issue over the life of a well. This results from poor cement jobs or porous cement that cannot successfully prevent gas flow from creating channels while curing. Remediating this through traditional practices of perf and squeeze or section milling is often expensive and unreliable. This paper will demonstrate a new way to create gas tight seals in casing annuli, minimizing the chance a well will experience casing vent flow by overcoming the limitations of cement in gas environments. This solution can be implemented at any stage of the well but is most effective when utilized as part of the original well construction.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献