Scaling and Corrosion in an Experimental Geothermal Power Plant

Author:

Bishop H.K.1,Bricarello J.R.1

Affiliation:

1. San Diego Gas and Electric

Abstract

JPT Forum articles are limited to 1,500 words including 250 words for each table and figure, or a maximum of two pages in JPT. A Forum article may present preliminary results or conclusions of an investigation that the present preliminary results or conclusions of an investigation that the author wishes to publish before completing a full study; it may impart general technical information that does not warrant publication as a full-length paper. All Forum articles are subject to approval by an editorial committee. Letters to the editor are published under Dialogue, and may cover technical or nontechnical topics, SPE-AIME reserves the right to edit letters for style and content. Introduction The San Diego Gas and Electric Co./U.S. DOE Geothermal Loop Experiment Facility (GLEF) located near Niland in the Imperial Valley, CA, has operated on a high-salinity (about 200,000 mg/L) geothermal fluid from the Salton Sea Field since May 1976. The conversion process being tested is a four-stage binary system (Fig. 1). The geothermal fluid is flashed at successively lower pressures in open drum-type separators. Generated steam pressures in open drum-type separators. Generated steam passes through a scrubber and into a tube and shell heat passes through a scrubber and into a tube and shell heat exchanger, where the heat is transferred to a secondary, working fluid. Steam condensate can be cascaded and mixed with the brine in the next stage, collected and combined with the cooled brine and reinjected, or used for cooling water make-up. The working fluid is condensed after expansion across a throttling valve that simulates a turbine. Waste heat is removed with a conventional spray pond, With a turbine generator (to be installed later) this facility will become a 10-Mw power plant. Water was used as the working (binary) fluid plant. Water was used as the working (binary) fluid during start-up and initial operation. Isobutane, which is the expected preferred working fluid for a binary power plant, will replace water. plant, will replace water. The GLEF operated for about 3,000 hours with frequent interruptions for inspection and facility modification. During this period, the facility operated on one production well (either Magmamax 1 or Woolsey 1). production well (either Magmamax 1 or Woolsey 1). Flow rates were 400,000 lb/hr, about one-half the GLEF design capacity. The temperature and pressure of the fluid entering the first stage is 370 deg. F and 165 psia. Exit temperature of the brine is 200 deg. F. All unflashed brine is reinjected in the reservoir. Brine Chemistry The geothermal fluid available from this reservoir is a hypersaline brine containing about 200,000 mg/L total dissolved solids (TDS), mostly chlorides (Table 1). These chlorides remain in solution during the heat extraction process and subsequently are injected back in the reservoir. Certain minor species, however, such as silica, lead, and iron have limited solubility and, as the brine is cooled during the heat extraction process, they precipitate from solution and deposit on pipe and vessel precipitate from solution and deposit on pipe and vessel surfaces. The principal noncondensable specie is carbon dioxide. Small amounts (up to 6 mg/L) of hydrogen sulfide also are found in this geothermal brine. Ammonia is also present in the geothermal brine and has a significant present in the geothermal brine and has a significant effect on brine chemistry. The pH of the brine (5.6 to 5.8) is such that a carbonate type of precipitate normally is not observed in spite of the high carbon dioxide level (up to 0.3 wt %). In this process, the available energy in the geothermal brine is extracted as steam. Drum separators and scrubbers can produce high-quality steam with a TDS content of less than 10 mg/L. However, noncondensable gases (carbon dioxide and hydrogen sulfide) also accompany this steam. Part of the ammonia in the geothermal brine also is driven off with the steam. When these noncondensable gases are removed, the pH of the brine increases to about 6.0. JPT P. 1240

Publisher

Society of Petroleum Engineers (SPE)

Subject

Strategy and Management,Energy Engineering and Power Technology,Industrial relations,Fuel Technology

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3