Automation of Mud-Pump Management: Application to Drilling Operations in the North Sea

Author:

Cayeux Eric1,Daireaux Benoît1,Dvergsnes Erik Wolden1

Affiliation:

1. International Research Institute of Stavanger

Abstract

Summary Drilling in the North Sea is confronted with an ever more challenging pressure-management issue because of narrow geopressure windows in depleted reservoirs. Further, the occurrence of packoffs can cause serious damage to the formation and contribute to nonproductive time. To address these problems, automation of mud-pump management has been developed over the last 4 years to minimize the chance of fracturing the formation while starting the mud pumps or circulating. To account for abnormal flow restrictions in the annulus, automatic actions are also an integral part of the mud-pump automation described in this paper. Since the downhole conditions are continuously changing (e.g., depth, temperature, flow-rate, gel time, cuttings proportion), the necessary safeguards to operate the mud pumps need to be updated constantly. Advanced transient temperature and hydraulic models are used to estimate, in real-time, the downhole situation. On the basis of the current context, evaluations of maximum pump rates and acceptable flow accelerations are performed and sent to the mud-pump control system to be used as an envelope of protection. Furthermore, to assist the driller during connections, the pump-startup procedure has been semiautomated to decrease connection time. Finally, an automatically triggered pump-shutdown procedure is also available to minimize the consequences of a packoff on formation fracturing. A first version of the system has been tested during the drilling of one well in 2008 in the North Sea. Based on the initial experience, a revised version has been used during the drilling of three wells drilled on the Norwegian continental shelf in 2009. The feedback from the drillers involved in the testing has been used to improve the user friendliness of the system. The automation of the mud-pump management has been well accepted by the drilling crews. However, the testing has shown that additional instrumentation at the rigsite is necessary before such automation can be rolled out safely.

Publisher

Society of Petroleum Engineers (SPE)

Subject

Mechanical Engineering,Energy Engineering and Power Technology

Cited by 10 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3