Subject
General Materials Science,Building and Construction
Reference28 articles.
1. NORSOK Standard D-010. Well integrity in drilling and well operations. Standards Norway. Rev. 4; 2013.
2. Khalifeh M, Saasen A, Hodne H. Techniques and materials for North Sea plug and abandonment operations. OTC 23915 presented at the OTC Offshore Technology Conference, Houston, Texas, USA, 6–9 May 2013.
3. Barclay IS, Johnson CR, Staal TW. Utilizing innovative flexible sealant technology in rigless plug and abandonment. Paper SPE 89622 presented at the SPE/ICoTA coiled tubing conference and exhibition, Houston, Texas, USA, 10–12 March 2004.
4. Calvert DC, Smith DK. Issues and techniques of plugging and abandonment of oil and gas wells. SPE 28349 presented at the 1994 SPE annual technical conference and exhibition, New Orleans, USA, 25–28 September 1994.
5. Oil & Gas UK. Guidelines on qualifications of materials for the suspension and abandonment wells. United Kingdom Offshore Oil and Gas Industry Association, Issue 1; 2012.
Cited by
51 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献