1. Aarø, R., Lund, B. F., & Onshus, T. (1995). Subsea HIPPS design procedure (Paper OTC 7829). In Offshore technology conference (OTC) proceedings, Houston, TX.
2. Ali, R. (2004). Problems, concerns and possible solutions for testing (and diagnostics coverage) of final control element of SIF loops. Technical papers of ISA, 454, 995–1002.
3. Ali, R., & Goble, W. (2004). Smart positioners to predict health of ESD valves. In Proceedings of the annual symposium on instrumentation for the process industries (pp. 29–37), Exida, Sellersville, PA.
4. Reliability and asset management: Smart positioners in safety instrumented systems;Ali;Petroleum Technology Quarterly,2003
5. ANSI/ISA 84.01 (1996). Application of safety instrumented systems for the process industries. Research Triangle Park, NC: The Instrumentation, Systems and Automation Society (ISA).