1. IMS Test Case 5: Holonic manufacturing systems;Valckenaers,1994
2. Flexibility for Integrated Production Automation;Valckenaers;PhD Thesis,1993
3. The evolution of control architectures for automated manufacturing systems;Dilts;J. Manuf. Syst.,1991
4. Programming, scheduling and control of flexible assembly systems;Van Brussel,1993