Author:
Anderson Bradley E.,Blocher James D.,Bretthauer Kurt M.,Venkataramanan Munirpallam A.
Subject
Computer Science Applications,Modeling and Simulation
Reference11 articles.
1. S.S. Panwalker, R.A. Dudek, M.L. Smith, Sequencing research and the industrial scheduling problem, in: S.E. Elmaghrabyl (Ed.), Symposium on the theory of Scheduling and its Applications, 1973, pp. 29–38.
2. Introduction to Sequencing and Scheduling;Baker,1974
3. Minimizing the sum of earliness/tardiness in multi-machine scheduling: a mixed integer programming approach;Zhu;Computers and Industrial Engineering,2000
4. Early/tardy scheduling with sequence dependent setups on uniform parallel machines;Balakrishnan;Computers and Operations Research,1999
5. Technical note: a simple model for optimizing the single machine early/tardy problem with sequence-dependent setups;Coleman;Production and Operations Management,1992
Cited by
15 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献