1. Final Report – Inspection Limit Confirmation for Upper Head Penetration Nozzle Cracking;Anderson,2008
2. ASM Metals Handbook vol. 3, nineth ed. ASM International, 1980.
3. ASME Boiler and Pressure Vessel Code, Section II, Part A: Ferrous Material Specifications. American Society of Mechanical Engineers, 2001.
4. Three-dimensional finite element welding residual stress analysis of penetration nozzles: I – sensitivity of analysis variables;Bae;Int. J. Pressure Vessels Pip.,2014
5. Corrosion issues in pressurized water reactor (PWR) systems;Calvar,2012