Author:
Wang Wei,Tong Jiejuan,Zhao Jun
Funder
National Science & Technology Specific Projects in China
Subject
Mechanical Engineering,Waste Management and Disposal,Safety, Risk, Reliability and Quality,General Materials Science,Nuclear Energy and Engineering,Nuclear and High Energy Physics
Reference35 articles.
1. American Nuclear Society (ANS), 2006. “Fire PRA Methodology Standard”, ANS-58.23.
2. American Society of Mechanical Engineers (ASME), 2009. “Addenda to ASME/ANS RA-S-2008 Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications”, ASME/ANS RA-Sa-2009.
3. AQSIQ (State Administration for Quality Supervision and Inspection and Quarantine) and China national standardization administration commission, 2008. GB/T 12788-2000, Criteria for class 1E power systems for nuclear power plants.
4. Coupling CFAST fire modeling and SAPHIRE probabilistic assessment software for internal fire safety evaluation of a typical TRIGA research reactor;Arshi;Reliab. Eng. Syst. Saf.,2010
5. A combined Monte Carlo and possibilistic approach to uncertainty propagation in event tree analysis;Baraldi;Risk Anal.,2008
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献