1. A fast and efficient analytical method for throughput evaluation of unreliable series-parallel production lines;Alaouchiche;Journal of Industrial and Management Optimization,2023
2. The time buffer approximated buffer allocation problem: A row–column generation approach;Alfieri;Comput. Oper. Res.,2020
3. Calcul de la productivité d’une ligne integrée de fabrication;Ancelin;RAIRO-Autom. Prod. Inf.,1987
4. Bottlenecks in Bernoulli serial lines with rework;Biller;IEEE Trans. Autom. Sci. Eng.,2010
5. Boese, K., Kahng, A., Muddu, S., 1993. On the Big Valley and Adaptive Multi-Start for Discrete Global Optimizations. Technical Report,U CLA CS Department, TR-930015.