1. Modelling single line train operations;Higgins;Transportation Research Record, Journal of the Transportation Research Board, Railroad Transportation Research,1995
2. Abdekhodaee A, Dunstall S, Ernst AT, Lam L. Integration of stockyard and rail network: a scheduling case study. Paper presented at the proceedings of the fifth Asia Pacific industrial engineering and management systems conference, Gold Coast, Australia; 2004.
3. A railway capacity determination model and rail access charging methodologies;Kozan;Transportation Planning and Technology,2005
4. Techniques for absolute capacity determination in railways;Burdett;Transportation Research Part B,2006
5. Ingolotti L, Tormos P, Lova A, Barber F, Salido MA, Abril M. A decision supporting system (DSS) for the railway scheduling problem. Technical report. Spain: DSIC, Universidad Politecnica de Valencia; Spain: DEIOAC, Universidad Politecnica de Valencia; Spain: DCCIA, Universidad de Alicante; 2005. URL: www.dsic.upv.es/users/ia/gps/papers/papers/aiai04.pdf 〈http://www.dsic.upv.es/users/ia/gps/papers/papers/aiai04.pdf〉.