Funder
FEDER
Principality of Asturias (Spain)
Severo Ochoa
Subject
Management Science and Operations Research,Modelling and Simulation,General Computer Science
Reference73 articles.
1. Scheduling: theory, algorithms, and systems;Pinedo,2008
2. The complexity of flowshop and jobshop scheduling;Garey;Math Oper Res,1976
3. Project scheduling under uncertainty;Herroelen;Eur J Oper Res,2005
4. A decomposition-based stochastic programming approach for the project scheduling problem under time/cost trade-off settings and uncertain durations;Klerides;Comput Oper Res,2010
5. A heuristic approach for resource constrained project scheduling with uncertain activity durations;Bruni;Math Methods Oper Res,2011
Cited by
74 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献