1. Aksoy, H. K., Gupta, S. M. (2004). Remanufacturing control in multistage systems with stochastic recovery rates. In Proceedings of the SPIE international conference on environmentally conscious manufacturing IV (pp. 264–273).
2. Buffer allocation plan for a remanufacturing cell;Aksoy;Computers and Industrial Engineering,2005
3. Characterization and computation of optimal policies for operating an M/G/1 queuing system with a removable server;Bell;Operations Research,1971
4. Operations planning issues in an assembly/disassembly environment;Brennan;International Journal of Operations and Production Planning,1994
5. A trial solution approach to the GI/M/1 queue with N-policy and exponential vacations;Chae;Journal of the Korean Statistical Society,2004