Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference52 articles.
1. Visual interactive fitting of Beta distributions;AbouRizk;J. Constr. Eng. Manag.,1991
2. Analysis of activity networks under uncertainty;Ang;J. Eng. Mech. Div.,1975
3. A multivariate approach to estimating the completion time for PERT networks;Anklesaria;J. Oper. Res. Soc.,1986
4. Project management: cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria;Atkinson;Int. J. Proj. Manag.,1999
5. Project management with time, cost, and quality considerations;Babu;Eur. J. Oper. Res.,1996