Author:
Bayraktar Mehmet Emre,Hastak Makarand
Subject
Building and Construction,Civil and Structural Engineering,Control and Systems Engineering
Reference30 articles.
1. Time-cost-quality trade-off analysis for highway construction;El-Rayes;J. Constr. Eng. Manag.,2005
2. Impact of urban freeway rehabilitation on network traffic: measurement and simulation study;Lee,2004
3. Lane rental—innovative way to reduce road construction time;Herbsman;J. Constr. Eng. Manag.,1998
4. Factors affecting contractors' risk of cost overburden;Akinci,1998
5. Integrated approach to TMDL development for the Neuse River Estuary using a Bayesian probability network model (Neu-BERN);Borsuk;J. Water Resour. Plan. Manage.,2003
Cited by
15 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献