1. Arditi, D., Ergin, U. and Gunham, S. (2000), Factors affecting the Use of Precast Concrete System, Journal of Architectural Engineering, 6(3), 79-86.
2. CIDB, (2003), IBS Roadmap 2003-2010, Construction Industry Development Board of Malaysia (CIDB).
3. CIMP, (2006), The Construction Industry Master Plan 2006-2015: Malaysian Construction Industry. .
4. Gibb, A.G.F. and Isack, F. (2003), Re-engineering Through Pre-assembly: Client Expectation and Drivers. Building Research and Information, 31 (2), 146-160.
5. Gibb, A.G.F, (1999), Offsite Fabrication: Prefabrication, Pre-assembly and Modularization, Whittles Publishing, Latherronwheel.