1. Delay mitigation in the Malaysian construction industry;Abdul-Rahman;Journal of Construction Engineering and Management,2006
2. Abdul-Rahman, H., Wang, C. and Jackson, C. (2011). ‘CTM4 model using Ishikawa diagram for quality management in design and build projects’, Scientific Research and Essays, 6(25), 5442-5456.
3. Think value engineering;Acharya;Journal of management in engineering,1995
4. Addis, A. and Talbot, R. (2001). Sustainable construction procurement: A Guide to Delivering Environmentally Responsible Projects’, CIRIA C571, CIRIA, London.
5. The extent of team integration within construction projects;Baiden;International Journal of Project Management,2006