1. Failure mode structured preventive maintenance scheduling with changing failure rates in industry 4.0 environment;Alamri;Front. Manuf. Technol.,2022
2. Identification and prioritization of risk factors in an electrical generator based on the hybrid FMEA framework;Alrifaey;Energy,2019
3. The challenge of deploying failure modes and effects analysis in complex system applications—quantification and analysis;Alruqi;Sustainability,2022
4. Quality risk management in pharmaceutical manufacturing operations: case study for sterile product filling and final product handling stage;Alsaidalani;Sustainability,2022
5. de Andrade, J.M.M., de M. Leite, A.F.C.S., Canciglieri, M.B., Szejka, A.L., Loures, E. de F.R., Canciglieri Junior, O.., 2020. A Multi-Criteria Approach for FMEA in Product Development in Industry 4.0, in: Transdisciplinary Engineering for Complex Socio-Technical Systems – Real-Life Applications. IOS Press. https://doi.org/10.3233/ATDE200090.