1. LI Y., KURU E. Numerical modeling of cuttings transport with foam in horizontal wells[J]. Journal of Canadian Petroleum Technology, 2003, 42(10): 54–61.
2. WANG Zhi-ming, ZHANG Zheng. A two-layer timedependent model for cuttings transport in extended reach horizontal wells[J]. Journal of Hydrodynamics, Ser. A, 2004, 19(5): 676–681(in Chinese).
3. MO YUE-LONG, WANG Hua and NIE Ming-hu et al. Discussion on underbalanced horizontal drilling technology[J]. West-China Exploration Engineering, 2008, (6): 55–58(in Chinese).
4. MENG Ying-feng, LIAN Zhang-hua and LI Hong-jie et al. Research on the cuttings-carried ability in gas horizontal drilling and its application to well baiqian-111H[J]. Natural Gas Industry, 2005, 25(8): 50–53(in Chinese).
5. THE DEPARTMENT OF ENGINEERING TECHNOLOGY AND MARKET OF CHINA NATIONAL PETROLEUM CORPORATION. Exploration and production company of PetroChina company limited horizontal well technology seminar proceedings[M]. Beijing: Petroleum Industry Press, 2008(in Chinese).