1. G. Ballard, The last planner system of production control, The University of Birmingham, 2000.
2. G. Ballard, Positive vs negative iteration in design, Proceedings Eighth Annual Conference of the International Group for Lean Construction, IGLC-6, Brighton, UK, 2000, pp. 17-19.
3. BIMForum, Level of Development Specification, bimforum.org, 2016.
4. B. Blumberg, D.R. Cooper, P.S. Schindler, Business research methods, 3rd European ed. ed., McGraw-Hill Higher Education, London, 2011.
5. D. Bryde, M. Broquetas, J.M. Volm, The project benefits of Building Information Modelling (BIM), International Journal of Project Management 31 (7) (2013) 971-980.