1. Blinn, C.R., R. Dahlman, L. Hislop, M.A. Thompson. Temporary stream and wetland crossing options for forest management. General Technical Report NC-202, USDA Forest Service, North Central Research Station, 1998.
2. Wallner M. and Pircher M . Kinematics of Movable Bridges. Journal of Bridge Engineering. 12(2), pp. 147-153.(2007).
3. Thrall AP, Adriaenssens S, Zaforteza IP, and Zoli TP (2012). Linkage-based movable bridges: Design methodology and three novel forms. Engineering Structures. 37, pp. 214-223.(2012).
4. Sedlacek G, Trumpf H, and Castrischer U. Development of a light-weight emergency bridge. Struct. Eng. Int., 14(4), pp. 282-287.(2004).
5. Wight RG, Erki MA, Shyu CT, Tanovic R, and Heffernan PJ (2006). Development of FRP short-span deployable bridge-Experimental results. Journal of Bridge Engineering. 11(4), pp. 489-498.(2006).