1. American Petroleum Institute(2000). Recommended Practice for Planning, Designing and Constructing Fixed Offshore Platforms-Working Stress Design (21st edition). Washington.
2. United Kingdom Department of Energy (1980). Report of the working party on the strength of grouted pile sleeve connections for offshore structures, Report No.ST41/80C, Wimpey Laboratories, Ltd.
3. Department of Energy (1988). Grouted and mechanical strengthening and repair of tubular steel offshore structures, Offshore Technology Report.(OTH88283).
4. Health&Security Executives. Assessment of strengthening clamp from the Viking offshore platform: Phase I. Offshore Technology Report 2000/057. United Kingdom.
5. Health&Security Executives (2002). Pile/Sleeve Connections. Offshore Technology Report 2001/016, Norwich.