Author:
Nowotarski Piotr,Pasławski Jerzy,Matyja Jakub
Reference9 articles.
1. Barriers in Running Construction SME – Case Study on Introduction of Agile Methodology to Electrical Subcontractor;Nowotarski;Procedia Engineering,2015
2. A study of the Toyota Production system;Shigeo,1989
3. R. F. Aziz, S.M. Hafez, Applying lean thinking in construction and performance improvement, Alexandria Engineering Journal Vol. 52, Issue 4, Alexandria University, 2013, pp. 679-695.
4. Triumph of the Lean Production System;Krafcik;Sloan Management Review,1989
5. The Toyota Way: 14 Management Principles from World Gratest Manufacturer;Liker,2004
Cited by
29 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献