1. Baker, A.D. 1992, Case study results with the market-driven contract net production planning and control system, Proc. of the AUTOFACT '92 Conf., Detroit, MI, SME. 31/17-31/35.
2. A perspective on new paradigms in manufacturing;Buzacott;J. of Manufacturing Systems,1995
3. Real-time distributed scheduling of heterarchical manufacturing systems;Duffie;J. of Manufacturing Systems,1994
4. Dynamics of social dilemmas;Glance;Scientific American,1994
5. Gou, L., Hasegawa, T., Luh, P.B., Tamura, S., Oblak, J.M. 1994, Holonic planning and scheduling for a robotic assembly testbed, Proc. of the 4th Int. Conf, on CIM and Automation Technology. IEEE, 142-149.