1. Non-linear dynamic response of ocean mining pipe;Babu;Proceedings of the ISOPE Ocean Mining Symposium,1999
2. Improved discrete element method for linear and nonlinear dynamic analysis of 3-D beam structures;Baorong;Tsinghua Sci. Technol.,1997
3. A time integration algorithm for structural dynamics with improved numerical dissipation: the generalized-α method;Chung;Journal of Applied Mechanics, Transactions ASME,1993
4. Full-scale, coupled ship and pipe motions measured in North Pacific Ocean: the Hughes Glomar Explorer with a 5,000-m-long heavy-lift pipe deployed;Chung;Int. J. Offshore Polar Eng.,2010
5. An articulated pipe-miner system with thrust control for deep-ocean crust mining;Chung;Mar. Georesour. Geotechnol.,1998