1. The water entry of slender axisymmetric bodies;Bodily;Phys. Fluids,2014
2. Albacora leste field development—FPSO P-50 mooring system concept and installation;Brandao,2006
3. High holding power torpedo pile: results for the first long term application;de Araujo,2004
4. Hydrodynamic aspects of the Torpedo anchor installation, OMAE2005-67201;Fernandes,2005
5. Torpedo anchor installation hydrodynamics;Fernandes;J. Offshore Mech. Arctic Eng.,2006