1. Design of integrated passive safety system (IPSS) for ultimate passive safety of nuclear power plants;Chang;Nucl. Eng. Des.,2013
2. Hallee, B.T., 2013, Feed-and-Bleed Transient Analysis of OSU APEX Facility using the Modern Code Scaling, Applicability, and Uncertainty Method, Master’s Thesis, Oregon State University.
3. An estimation of an operator’s action time by using the MARS code in a small break LOCA without a HPSI for a PWR;Han;Nucl. Eng. Des.,2007
4. Evaluation of SAMG effectiveness in view of group decision;Hur;Nucl. Eng. Technol.,2012
5. IAEA-TECDOC-719, 1993, Defining initiating events for purposes of probabilistic safety assessment, IAEA.